Engelberth Construction was hired for the expansion of a Vermont dairy production facility. The project was done in multiple phases to accommodate continued operations. The expansion increased the facility by 38 percent and included renovation to the existing fresh cheese facility. Phase 1 included constructing two new block additions. An 1,870 sf addition to house…
Industrial Projects
Private Client Manufacturing Reconfiguration
Engelberth Construction was hired by a client, who employs nearly 250 people with production shifts around the clock, for an extensive $5.1 million plant renovation. Changes in technology and an increase in personnel demanded the need to realign and reorganize the space for new processes to increase production and efficiency at the plant. Upgrades to the…
Keurig Green Mountain Plant Process Equipment Install
Engelberth Construction assembled and installed four (4) new Scolari roasters at Keurig Green Mountain’s expanding Essex Plant. The project also included the installation of four (4) thermal oxidizers mounted to the superstructure on the roof directly above the roasters and the assembly and installation of grinders and anchoring of hoist structures. Supporting equipment was also…
Perrigo Nutritionals Packaging Line
Perrigo Nutritionals, Inc., an infant formula manufacturer, invested $29 million in developing its new packaging line and installing the necessary equipment at its Georgia, Vermont facility. Engelberth Construction led the installation process, subcontracting specialized mechanical, electrical and rigging requirements to more than a dozen smaller local businesses. The line fell within one percent of the…
GW Plastics Expansion
Engelberth constructed a 15,000 square foot manufacturing, warehouse and office addition to GW Plastics’ Technical Campus in Royalton, Vermont for their GW Silicones Division. The addition includes a new ISO Class 8 clean room, the capability to support up to 18 additional state-of-the-art machines for silicone molding and assembly, as well as private offices, bathrooms…
Keurig Green Mountain Plant Expansion
Engelberth Construction completed the construction of the new 75,000 sf, three story addition to Green Mountain Coffee Roasters existing production and packaging facility. The expansion increased efficiencies and maximized the output potential of the Waterbury, Vermont site. The project was constructed in various phases so production could begin as quickly as possible. The first floor…
Montpelier District Heat Plant Renovation & Addition
The Montpelier District Heat Plant project was an expansion to the State Capital Complex’s existing boiler plant. Designed to flood proof the existing building and add an addition above the 100 year base flood elevation – the new Heat Plant allows for fuel offloading, the addition of two new modern wood-chip boilers, the relocation of…
AstenJohnson Filaments Expansion
Engelberth Construction renovated and constructed new space for AstenJohnson doubling the size of the plant, primarily to accommodate more warehouse and manufacturing space. 17,560 square feet of manufacturing space was added to the plant including a new mezzanine. A new 18,810 square feet warehouse was also constructed along with 4,220 square feet of additional office…